SATO TG312 Instruction Manual Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 152
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
Section 2: Installation
TG3 Series Operator Manual Page 2-9
2.6 LOADING THE CARBON RIBBON (cont’d)
4.
From the ribbon supply spindle, pass the carbon
ribbon underneath the print head assembly to the
ribbon take-up spindle.
Route the ribbon behind and over the top of the ribbon
take-up spindle and place the leader portion of the car-
bon ribbon to the rubber pad of the ribbon take-up
spindle.
Confirm that the ribbon has been loaded as shown in the
figure on the right or as illustrated on the inner side of
the main cover
Note:
Do not pass the carbon ribbon underneath the pitch sen-
sor unit.
5. Then turn the take-up spindle several times in the
direction of counter-clockwise to wind the ribbon around
the spindle.
6. Remount the print head by turning the head lock lever
clockwise until it latch on. The print head should lock into
place firmly.
7. After loading the media and the carbon ribbon, close the
main cover, turn on the printer and do a test print to check
that the media roll has been loaded properly. See Section
3.12 Test Print Mode for instructions on how to run test
print.
Rubber pad
Leader portion
of ribbon
Head lock
lever
(purple)
Main cover
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 151 152

Comments to this Manuals

No comments